Fibreglass Swimming Pool Installation
DIY Guide
At Pools For Africa, Our Friendly And Supportive Team Is Dedicated To Providing You With All The Necessary Information To Embark On Your Fibreglass Swimming Pool Installation Journey. Opting For A DIY Installation? Follow Our Comprehensive Guideline Below For Successful Installation.
DIY Swimming Pool Options
- Basic Package: Includes The Fibreglass Pool Shell And A Weir/Skimmer Box With Aim-Flow Fitted.
- Standard Package (Recommended): Includes The Fibreglass Pool Shell, Weir/Skimmer Box, Jets, And An LED Light Fitted As Standard.
Planning And Permissions For Pool Installation
1. Research Building Restrictions And Planning Permissions:
– Ensure You Are Aware Of Any Local Building Restrictions And Obtain The Necessary Permissions.
2. Check For Utilities:
– Use Utility Plans Or Above-Ground Evidence (E.G., Manholes) To Identify Potential Utility Interferences.
3. Determine Pool Size And Placement:
– If Needed, Consult A Draughtsman Or Architect For Drafting Plans And Submitting Them For Planning Consent.
– Decide Where To Place The Pump And Filter As This Will Impact The Type And Quantity Of Materials Required.
4. Order And Prepare For Delivery:
– Once Permissions Are Obtained, Order Your Pool And Schedule A Delivery Date.
– Ensure Sufficient Manpower Or The Correct Machinery Is Available For Offloading The Pool On-Site.
– Ensure You Are Aware Of Any Local Building Restrictions And Obtain The Necessary Permissions.
2. Check For Utilities:
– Use Utility Plans Or Above-Ground Evidence (E.G., Manholes) To Identify Potential Utility Interferences.
3. Determine Pool Size And Placement:
– If Needed, Consult A Draughtsman Or Architect For Drafting Plans And Submitting Them For Planning Consent.
– Decide Where To Place The Pump And Filter As This Will Impact The Type And Quantity Of Materials Required.
4. Order And Prepare For Delivery:
– Once Permissions Are Obtained, Order Your Pool And Schedule A Delivery Date.
– Ensure Sufficient Manpower Or The Correct Machinery Is Available For Offloading The Pool On-Site.
Marking Out
1. Measure And Mark:
– Measure The Exact Dimensions Of The Pool And Mark Its Shape On The Ground With A 250-400mm Over-Dig Allowance For Backfilling. Increase Over-Dig For Clay Conditions.
– Mark The Position Of The Weir/Skimmer.
2. Set A Fixed Datum Point:
– Use A Fixed Reference Point Like A Concrete Patio Or Fence Mark For All Measurements.
3. Mark Pegs:
– Mark All Pegs For The Datum Level, Representing The Exact Pool Height Lip Or Flange. Use A Water Level To Transfer This Datum To Other Pegs.
– Measure The Exact Dimensions Of The Pool And Mark Its Shape On The Ground With A 250-400mm Over-Dig Allowance For Backfilling. Increase Over-Dig For Clay Conditions.
– Mark The Position Of The Weir/Skimmer.
2. Set A Fixed Datum Point:
– Use A Fixed Reference Point Like A Concrete Patio Or Fence Mark For All Measurements.
3. Mark Pegs:
– Mark All Pegs For The Datum Level, Representing The Exact Pool Height Lip Or Flange. Use A Water Level To Transfer This Datum To Other Pegs.
Excavation
1. Excavate The Pool Area:
– Keep The Sides As Vertical As Possible. Ensure The Depth Is 50mm Deeper Than The Pool To Allow For A Sand/Crusher Dust Screed.
– Use String Across Two Datum Points To Measure Depth.
2. Set Pegs Or Bricks:
– Place Pegs Or Bricks At The Deep And Shallow Ends According To Depth Measurements.
– Keep The Sides As Vertical As Possible. Ensure The Depth Is 50mm Deeper Than The Pool To Allow For A Sand/Crusher Dust Screed.
– Use String Across Two Datum Points To Measure Depth.
2. Set Pegs Or Bricks:
– Place Pegs Or Bricks At The Deep And Shallow Ends According To Depth Measurements.
Pool Bedding
1. Prepare The Bedding:
– Lay A Bed Of River Sand Or Crusher Dust, Compact It Thoroughly, And Ensure It Is Slightly Deeper Than Required.
– Use A Straight Edge On Brick Lanes Or Levelling Timbers To Pull The Screed To The Required Depth.
2. Check And Adjust:
– Verify Datum And Pool Depth, Removing Any Stones In The Bedding.
– Lay A Bed Of River Sand Or Crusher Dust, Compact It Thoroughly, And Ensure It Is Slightly Deeper Than Required.
– Use A Straight Edge On Brick Lanes Or Levelling Timbers To Pull The Screed To The Required Depth.
2. Check And Adjust:
– Verify Datum And Pool Depth, Removing Any Stones In The Bedding.
Placing The Pool Shell
1. Install Fittings:
– If Not Pre-Installed, Install The Weir/Skimmer, Light, And Aimflow/Jets.
2. Position The Pool:
– With Adequate Assistance, Lift And Place The Pool Shell Gently Into The Hole, Ensuring It Is Aligned With Your Plan And Pegs.
– If Not Pre-Installed, Install The Weir/Skimmer, Light, And Aimflow/Jets.
2. Position The Pool:
– With Adequate Assistance, Lift And Place The Pool Shell Gently Into The Hole, Ensuring It Is Aligned With Your Plan And Pegs.
Final Adjustments
1. Level The Pool:
– Check The Datum Level Around The Pool Using A Water Level. Lift And Adjust As Necessary.
– Check The Datum Level Around The Pool Using A Water Level. Lift And Adjust As Necessary.
Backfilling
1. Begin Filling And Backfilling:
– Fill The Pool With Water And Backfill Simultaneously In 300mm Increments Using A 1:10 Cement To River Sand Mix, Or Crusher Dust.
2. Ensure Stability:
– Ensure The Edge Remains Straight By Checking Against A String Line. Adjust Backfill As Needed.
3. Secure Under Steps And Seats:
– Use A Small Batten To Force The Sand Mix Into Hollow Spots.
– Fill The Pool With Water And Backfill Simultaneously In 300mm Increments Using A 1:10 Cement To River Sand Mix, Or Crusher Dust.
2. Ensure Stability:
– Ensure The Edge Remains Straight By Checking Against A String Line. Adjust Backfill As Needed.
3. Secure Under Steps And Seats:
– Use A Small Batten To Force The Sand Mix Into Hollow Spots.
Plumbing & Filtration
1. Install Pump And Filter:
– Position The Pump And Filter Near The Pool. Connect The Pipes Using PVC Cement And PTFE Tape.
2. Rinse Piping:
– Rinse The Pool Piping On The Multiport Valve Before Inserting Jets.
– Position The Pump And Filter Near The Pool. Connect The Pipes Using PVC Cement And PTFE Tape.
2. Rinse Piping:
– Rinse The Pool Piping On The Multiport Valve Before Inserting Jets.
Electrical
1. Hire A Qualified Electrician:
– Ensure The Electrician Issues A Certificate Of Compliance (COC) And That The Electrical System Is Properly Earthed.
2. Ensure Waterproof Connections:
– Use Resin Boxes With Connectors For Pool Light Wiring To Ensure Waterproof Connections.
– Ensure The Electrician Issues A Certificate Of Compliance (COC) And That The Electrical System Is Properly Earthed.
2. Ensure Waterproof Connections:
– Use Resin Boxes With Connectors For Pool Light Wiring To Ensure Waterproof Connections.
Ring Beam And Coping
1. Lay A Ring Beam:
– At 100mm From The Top Of The Pool, Cease Backfilling And Lay A Concrete Ring Beam To Secure The Pool Edge And Coping.
2. Attach Pool To Ring Beam:
– Some Installers May Attach The Pool To The Ring Beam With Ties For Added Security.
– At 100mm From The Top Of The Pool, Cease Backfilling And Lay A Concrete Ring Beam To Secure The Pool Edge And Coping.
2. Attach Pool To Ring Beam:
– Some Installers May Attach The Pool To The Ring Beam With Ties For Added Security.
Congratulations!
You Have Successfully Installed Your Fibreglass Swimming Pool. Enjoy Your New Pool And The Satisfaction Of A Job Well Done!